Project Overview
Pellings provided Building Surveying and Employer’s Agent services for the refurbishment of Tooting Bec Lido, the largest lido in Europe. On behalf of Wandsworth and Richmond Borough Councils, the project sought to improve the lido’s operational efficiency, elevate its standards, and enhance its aesthetic appeal, all while preserving its historic significance.
The refurbishment focused on the replacement of the pool liner, upgrading the historic pool’s grid power connection, and constructing a new plant building. These improvements aimed to modernise the lido’s water filtration and circulation systems, future-proof the infrastructure, and ensure it remains a vibrant community asset for years to come.
Scope of Services
- Replacement of Pool Liner: Ensuring the longevity and functionality of the lido.
- Power Infrastructure Upgrades: Modernising the pool’s grid power connections.
- Construction of a New Plant Building: Introducing updated pool infrastructure and essential water filtration systems.
- Sustainability Initiatives: Incorporating green roofs on the pump house to support biodiversity and encourage wildlife on-site.
Challenges
During the project, Pellings encountered several challenges related to the aging infrastructure and unforeseen complications:
- Century-Old Infrastructure: The lido’s historic structure presented obstacles, requiring careful preservation while implementing modern upgrades.
- Gas Supply Issues: Unforeseen complications with the gas supply necessitated on-site adjustments and rerouting of utilities.
- Asbestos Discovery: Asbestos was discovered beneath the existing infrastructure, requiring specialist management and removal.
- Pump House Redesign: Usability concerns arose, necessitating a complete redesign of the pump house layout.
Solutions
Pellings tackled these challenges through innovative problem-solving and collaboration with key stakeholders. Solutions included:
- On-Site Redesign: Adapting pump house designs to address usability concerns.
- Utility Rerouting: Reworking utility plans to accommodate unexpected gas supply issues.
- Risk Mitigation: Working closely with contractors and council representatives to minimise disruption and ensure timely project completion. Despite facing a £120,000 drainage variation, Pellings kept the project on track, delivering on time and within budget.
Outcomes
The successful refurbishment has rejuvenated Tooting Bec Lido, preserving its heritage while offering modern amenities. With improved water filtration and circulation systems, the lido is now better equipped to serve the local community. The green roof on the pump house contributes to the site’s biodiversity, enhancing both sustainability and user experience.
Looking forward, future plans include the refurbishment of the lido’s changing rooms and café, scheduled for 2026.
< Back