Project Overview
Pellings was appointed by Haus Block Management to provide comprehensive Employer’s Agent and Project Management services for the cladding remediation of Royal Tower Lodge. This project focused on the top two storeys of the residential building, addressing the need to replace non-compliant façade materials and ensure compliance with the latest fire safety standards.
The scope of work included the installation of external wall insulation (EWI), render and brick slip applications, and aluminium panels. The project was successfully completed with the achievement of an EWS1 form, certifying that the building meets fire safety regulations.
Scope of Works
- Render and brick slip application
- External wall insulation installation
- Aluminium panels installation
- Removal and replacement of non-compliant façade materials
- Installation of a temporary roof during guttering removal to mitigate weather risks
Pellings’ role extended from the initial feasibility study to project completion, ensuring that all aspects of the project were delivered on time and to the highest standard.
Challenges
- Complex Façade Removal: The removal and replacement of non-compliant materials on an occupied building required meticulous planning and execution to ensure the safety and comfort of residents.
- Weather-Related Risks: The installation of a substantial temporary roof during guttering removal was crucial to protecting the building from potential weather damage. Managing this installation efficiently was a key priority.
- Resident Coordination: As Royal Tower Lodge remained fully occupied during the project, minimising disruption and maintaining communication with residents was essential.
Project Management Approach
Pellings began with a feasibility survey to assess the condition of the existing materials and develop detailed Employer’s Requirements. This formed the foundation for clear project planning and precise execution.
We managed all aspects of the cladding remediation, including the safe removal of non-compliant materials and the installation of new, fire-compliant systems. Our team also efficiently oversaw the installation of the temporary roof, mitigating potential risks related to weather, and ensuring the building remained secure throughout the project.
To maintain resident satisfaction, we adopted a transparent and communicative approach, hosting regular open-door meetings and distributing newsletters to keep residents informed of the project’s progress.
Key Results
- Successful Delivery of Cladding Remediation: Pellings delivered seamless cladding remediation, addressing both safety and aesthetic concerns.
- EWS1 Form Achieved: The project was completed to full compliance, resulting in the issuance of the EWS1 form, confirming the building’s adherence to fire safety standards.
- Minimal Resident Disruption: Through careful planning and consistent communication, the project team ensured minimal disruption to residents during the works.
From initial feasibility to the final EWS1 certification, Pellings expertly navigated every phase of the project, ensuring successful outcomes and compliance with the latest safety regulations.