For Learning
Freemantles SEND School

Project Overview

Pellings was appointed to support the Freemantles School Expansion as part of Surrey County Council’s Schools Expansion Programme. Freemantles is a school for children with complex social communication needs, and the expansion was driven by the requirement to accommodate an additional 144 pupils with Special Educational Needs.

The project included the construction of a new two-storey secondary school building, designed with high durability to cater to the specific needs of pupils aged 11-18. The new facilities replaced temporary classrooms and introduced modern educational spaces, including classrooms with direct outdoor access, creative arts spaces, and quiet rooms.

Scope of Services

  • Design & Construction Management: Full multidisciplinary services up to planning, including Project Management, Quantity Surveying, and Employer’s Agent roles.
  • New Two-Storey Building: Incorporating six classrooms, a creative arts space, quiet rooms, a sensory room, a food technology room, and additional learning spaces.
  • Robust Construction: The design focused on creating a durable environment to handle the unique requirements of pupils, with reinforced plasterboard, heavy-duty doors, and secure light fittings.
  • Outdoor Areas: All classrooms featured direct access to outdoor spaces, including balconies for first-floor rooms, ensuring flexible use during students.
  • Demolition & Site Improvements: Removal of temporary classroom blocks and installation of a new car park with 105 spaces and EV charging points, alongside a Multi-Use Games Area (MUGA).

Challenges

  • Managing Ongoing School Operations: The school continued operating during the construction, requiring careful coordination to avoid disruptions. Noise and visual distractions were minimised, and deliveries were planned to reduce impact on school activities.
  • High Durability Requirements: A thorough client consultation process ensured all materials and fixtures met the highest durability standards, including ceiling soffits with robust absorbers and vision panels in doors to prevent weakening.
  • Unforeseen Conditions: Issues with utilities and site conditions were overcome through proactive communication and on-site problem-solving, maintaining project momentum.

Solutions

  • Timber Construction System: A Streif timber frame system with timber cassette Structural Insulated Panels (SIPs) was used for the upper levels, while the lower levels utilised durable brick.
  • Collaborative Design Process: Working closely with the school’s leadership team and Surrey County Council, Pellings ensured that the design aligned with the specific needs of the pupils and adhered to budget and schedule constraints.
  • Phased Approach: The project was divided into two phases, with the first focusing on the new build, and the second on the demolition of temporary buildings.

Outcome

The expansion of Freemantles School provides much-needed, modern educational spaces tailored to SEN requirements. The robust design and flexible indoor and outdoor spaces ensure that students have a safe, engaging learning environment. In addition to the new facilities, Pellings’ careful planning and execution allowed the project to proceed without major disruption to the school’s daily operations.



< Back